University Palisades

A hundred and sixty-two houses built in three phases across thirteen years

At a glance
LocationPittsfield Township, off Ellsworth Road just east of Carpenter Road, about six and a half miles southeast of downtown Ann Arbor; Ann Arbor mailing address; Washtenaw County
Built1990–2003, in three phases
HousingAbout 162 detached houses; two-story colonials and ranches, 3–4 bedrooms, 2–2.1 baths, full and often finished basements, 2- to 3-car attached garages
NearbyUS-23 and I-94 a short drive; Carpenter Road shopping corridor; straightforward route east toward the airport
Era1990–2003 build: first phase inside the polybutylene supply-pipe window, later phases clear of it; early hardboard/composite siding depends on how edges were sealed; first-generation furnace, AC and roof reach end of life around 20–25 years, and a storage water heater well before that

Era notes describe what a build date makes likely across houses of that period. A year built is not proof of what any one property contains: materials, alterations and equipment are established from the records and an appropriate inspection.

Ask about University Palisades
Answered personally within one business day. This also creates your free account, so you can come back without a password and keep your details current. Your details are never shared.
The neighborhood

About University Palisades

University Palisades is a subdivision of about 162 houses off Ellsworth Road just east of Carpenter Road, roughly six and a half miles southeast of downtown Ann Arbor, developed in three phases between 1990 and 2003.

Houses are two-story colonials and ranches with three to four bedrooms, full and often finished basements, and two- to three-car attached garages.

Worth knowing
  • —Three phases across thirteen years is three products under one name
  • —Phasing usually means more than one recorded plat, with different restrictions
  • —In Michigan notation, 2.1 baths means two full and one half
  • —Below-grade finished space is not credited like above-grade square footage
  • —A finished basement conceals what an inspector would otherwise see
  • —Basement finishing is frequently unpermitted — the record is free to check

Three phases across thirteen years

A subdivision developed in three phases between 1990 and 2003 is three products under one name, and treating it as one is the most common mistake made here.

Thirteen years separates the earliest houses from the latest. That is a full replacement cycle for roofs and mechanical systems, more than one code revision, and a different generation of building materials. A house from the first phase and a house from the third are not comparable sales for one another without adjustment, whatever their square footage says.

The era question is where the phases separate most sharply. The third phase, in the early 2000s, sits well clear of it. Have the piping identified by material during the inspection rather than inferred from the subdivision name.

Phasing also usually means more than one recorded plat. Restrictions attach to plats rather than to marketing names, so the terms governing what may be built, parked or altered can differ between phases of what looks from the street like one subdivision. Obtain the instrument recorded against the specific parcel rather than relying on a general description.

The upside of 162 houses is genuine comparable depth. Match on phase and plan and the analysis becomes tight; match on the subdivision name alone and it stays approximate.

Two-point-one baths, and what the notation means

Michigan listings state bathroom counts in a shorthand that misleads people from other markets, and the houses here are commonly described with two or two-point-one baths.

The convention is that the number before the decimal counts full bathrooms — with a bath or shower — and the number after counts half bathrooms, a lavatory and basin only. So two-point-one means two full bathrooms and one half. Two-point-two would mean two full and two half, which is a fixture group more than most people reading it quickly would assume.

This matters for comparison because the common national convention writes the same house as two and a half, and reading a Michigan two-point-two as two and a half undercounts the plumbing entirely.

The practical version for a buyer is to count the fixtures at a showing rather than trusting the notation, and to be specific about what a listing is claiming when comparing two houses.

For a seller, stating it both ways removes an ambiguity that only ever works against you with a buyer from out of state — and southeast Michigan draws a great many of those.

Finished basements, and what to check

Full basements that are often finished are a defining feature here, and a finished basement is one of the most commonly mispriced things in a house.

The valuation question comes first. Below-grade finished space is generally not counted in the same way as above-grade square footage by appraisers, and how much credit it receives varies. Two houses with identical total finished area can appraise differently depending on how much of it is below grade. That is not a reason to discount a finished basement — it is genuinely usable space, and for many buyers it is the whole point — but it is a reason to expect the appraisal arithmetic to differ from the listing arithmetic.

Then the practical checks. A finished basement conceals the things an inspector would otherwise see: the foundation walls, the framing, the underside of the floor above, and any staining that would tell you about past water. That makes the seller's written answer about water history more valuable, not less.

Look for grade falling away from the building on all sides, gutters and downspouts discharging well clear of the foundation, and no staining or efflorescence at the base of finished walls or on any exposed section. Ask whether there is a sump pump and whether it has a battery backup — a pump without one is useless in the storm that causes the power cut.

Ask, too, whether the finishing was permitted. Basement finishing frequently is not, and unpermitted work raises questions about egress windows in any sleeping room, ceiling heights, and whether the work was inspected at all. The municipality's building department holds the permit record, and checking it costs nothing.

Where this actually is, which is worth pinning down

This subdivision carries an Ann Arbor identity, sits off Ellsworth Road east of Carpenter, and is associated with both Pittsfield Township and the Ypsilanti area. Those are not contradictions so much as three different lines that genuinely do not coincide, and all three matter.

The mailing address is a postal delivery route and settles nothing about jurisdiction.

Pittsfield Charter Township occupies much of the ground here and is a separate government from both Ann Arbor and Ypsilanti, with its own board, rate, services, zoning and assessor. The rate difference between a city and a township parcel is real and recurring, and it is why comparable sales must be matched on municipality.

The school district is a third line again and does not track either of the others. This part of the county sits where Ann Arbor Public Schools, Ypsilanti Community Schools and Saline Area Schools boundaries approach one another, and district is one of the larger drivers of price difference between otherwise comparable houses.

A buyer who assumes one answer from the address, or a seller who lets a buyer assume it, is setting up a problem that surfaces late in a transaction. All three answers are free and obtainable in an afternoon.

The Ellsworth and Carpenter corridor

This part of the county sits on working east-west and north-south corridors rather than in a quiet pocket, and that is both the convenience and the trade-off.

US-23 and I-94 are both within a short run, Carpenter Road carries a substantial amount of everyday commerce northward, and the corridor east toward the airport is straightforward. A great deal is reachable without crossing central Ann Arbor, which for many households is the whole argument for being here.

Traffic is the other side. How much reaches a particular house depends on distance from the corridor, orientation and what stands between — and within a subdivision of 162 those differences are large and are not reflected in square footage. A weekday rush hour visit with the windows open settles it.

Where open ground adjoins the subdivision, its durability depends on ownership rather than appearance: publicly held land, land under a recorded conservation easement, association common area, and merely unbuilt private ground are four different assurances that look identical from a window. In a corridor location with development pressure, the fourth tier is more common than people assume, and one inquiry to the township settles it.

Four tiers of protected open space

Where open ground adjoins a property, ownership is the first thing that decides whether it stays open — but not the only one.

Land held by a public body is generally the most durable, though a public body can still sell or repurpose land. Land under a recorded conservation easement is next — an easement runs with the land, surviving a change of owner and of local board. Association common area is real protection that the owners themselves pay for. Unbuilt private land carries the least protection of the four, but that is not the same as none: zoning, recorded deed restrictions and state wetland regulation can each constrain what may be built, filled or cleared, and EGLE requires authorization for specified activities affecting regulated wetland.

From a window all four look identical, which is why it is worth checking the record rather than the view: ownership, any recorded easement or restriction, the zoning, whether wetland is mapped, and whether a development application has already been approved.

Schools

Assignment is set by address rather than by neighborhood name, and district boundaries in this county cross municipal and postal lines routinely. District is one of the larger drivers of price difference between otherwise comparable properties, so comparables should be matched on it as well as on municipality.

Buying or selling here

The phase and the jurisdiction are the two things to establish, and both are commonly assumed rather than checked.

Community details reflect public records and local knowledge and can change — always verify what matters to your purchase. Explore more of Ann Arbor's neighborhoods, or browse active listings.